Back top product overview

SEFACO IRISH TRELLIS INSTALLATION 
GUIDE
 

                     

Part 2:  Step 5 to Step 9

Step 5
Install the upper molding first, then the lower molding and then one of the vertical moldings.
Step 6
Tape the corners to keep the assembled unit firmly in place.
Step 7
The excess strip can be marked firmly with a sharp knife, to create a cut-line.
Step 8
Bend the overhanging section along the cut-line and remove the excess trellis strip. After installing the final vertical border, tape the corners (see step 6).
Step 9
You are now ready to install your trellis section. We recommend that you drill in screws 20"part. Drill at back of the section along the interior Fixation Surface, beginning with the top molding.

 

[ Previous Page


| WelcomeCompany Profile | News & Events | Your Project | 
| PVC Fences | PVC Railings | Slats for Chain Link Fences | PVC Garden Acc. | PVC Trellises |
| PVC Expert Railing System | Installation GuideBecome a Dealer |
| Contact Us | Downloads | About this Site | SiteMap |

Sefaco inc is a division of DCN Plastic