Back top product overview

SEFACO IRISH TRELLIS INSTALLATION 
GUIDE
 

                     

Part 1:  Step 1 to Step 4

Step 1
Measure the space to be covered (height, width). transfer these measurements onto the interior fixation surface of the molding.
Step 2
Using a fine-toothed blade, cut the molding at 45 degrees to the required dimensions.
Step 3
To assemble the trellis, use thumb to press firmly from bottom to top. Connect enough strips to exceed the width of the section.
Step 4
To make the strips easier to slide into the border cut the Retention Lips on an angle.

[ NEXT PAGE


| WelcomeCompany Profile | News & Events | Your Project | 
| PVC Fences | PVC Railings | Slats for Chain Link Fences | PVC Garden Acc. | PVC Trellises |
| PVC Expert Railing System | Installation GuideBecome a Dealer |
| Contact Us | Downloads | About this Site | SiteMap |

Sefaco inc is a division of DCN Plastic